DOES Logo Graphic

Scheduler Node

A Scheduler node represents a Scheduler that is defined for a host. A Scheduler submits the individual runs of an Iteration. If multiple Schedulers are defined and active, multiple Iterations may be submitting runs concurrently. However, only on Iteration per ExpertDesign may be active at a time.

The menu associated with a Scheduler node contains the following actions:

DOES has been developed by OPTIMUM Power Technology. For more information, contact:
500 Millers Run Road  •  P.O. Box 509   •  Morgan, PA 15064   •  Phone: 412-257-9070   •  Fax: 412-257-9011   •  sales@optimum-power.com